EIA in Prague - tables

informace z ročenky Praha ŽP 2006

(the text from the chapter Environment impact assessment (EIA) in Prague published in yearbooks Prague Environment 2006)

Tab. Overview of EIA activities under the responsibility of the OOP MHMP pursuant to the Act No. 100/2001 Code, status from 1. 9. 2005 to 31. 8. 2006

(Order number means the order of the EIA process in the EIA Information System since the Act No. 100/2001 Code has become effective, i.e. since 1. 1. 2002.)

No. Name of activity Date of the EIA
notification
Conclusion of the
preliminary procedure
Phase of the EIA project

021

Temporary parking Štěpařská, Hlubočepy

9. 10. 2002

15. 11. 2002 EIA yes

Interrupted on 2. 10. 2003

031

Supermarket Julius Meinl and multipurpose building,
ul. Mariánská, k.ú. Kamýk

5. 12. 2002

31. 1. 2003 EIA yes

The EIA process terminated
pursuant to Section 23 (2)
of the Act on 31. 3. 2006

048

Office premises of a. s. Pankrác, Prague 4

4. 4. 2003

7. 7. 2003 EIA yes

Expert opinion ordered on
11. 8. 2006

052

Underground garages
Klárov v Praze 1 - Malá Strana,
ul. U Železné lávky

15. 5. 2003

16. 7. 2003 EIA yes

Compiling documentation

081

Office premises of
X-POINT, ul. Vyskočilova, Praha 4

5. 1. 2004

23. 2. 2004 EIA yes

Compiling documentation

098

ARENA CENTRUM PRAHA,
Holešovický pivovar, U Průhonu 13/800,
Praha 7 - Holešovice

14. 5. 2004

15. 7. 2004 EIA yes

Consent given on
30. 12. 2005

102

Residential and administrative centre on
náměstí W. Churchilla v Praze 2

23. 6. 2004

30. 8. 2004 EIA yes

Consent given on
14. 11. 2005

105

Multipurpose centre
Grafická, Praha 5 - Smíchov

18. 8. 2004

18. 10. 2004 EIA yes

Compiling documentation

106

Siemens KV – Paint shop II,
Praha - Zličín

23. 8. 2004

7. 10. 2004 EIA no

107

Libeň docklands –
DOCKS 8, Praha 8, k.ú. Libeň

6. 9. 2004

19. 1. 2005 EIA no

108

Change to printing operations – printing house K.P.R., spol. s r. o. v Praze 9, Pod Šancemi 4/196

17. 9. 2004

13. 12. 2004 EIA no

109

Business and service centre Hostivař, Praha

23. 9. 2004

6. 1. 2005 EIA no

110

Westpoint Distribution Park Ruzyně,
administrative building South, k.ú. Ruzyně

11. 10. 2004

29. 11. 2004 EIA no

111

Multistorey garages Lovosická, Praha 9 - Prosek

18. 10. 2004

20. 12. 2004 EIA no

112

Printing house MATRIX
Media, s. r. o., Přístavní 29, Praha 7

25. 10. 2004

4. 1. 2005 EIA yes

Compiling documentation

123

Shopping centre
Háje, Praha 11

28. 1. 2005

17. 5. 2005 EIA yes

Compiling documentation

128

BB Centrum – Office building FILADELFIE,
Praha 4 - Michle

16. 2. 2005

18. 4. 2005 EIA yes

Consent given on
24. 2. 2006

136

Prague National Golf Club – Praha 16

2. 5. 2005

The EIA process cancelled
upon the investor request on
5. 9. 2005; for new notification see 166

138

Prolonged interim period of the concrete mixing plant Horní Měcholupy, Praha 15

4. 5. 2005

5. 10. 2005 EIA no

139

Industrie Park Sever, Praha 20,
k.ú. Horní Počernice

10. 5. 2005

15. 9. 2005 EIA no

141

Reconstruction and additional constructions
on the premises EMPIRIA – part III,
Praha 4 - Pankrác

25. 5. 2005

18. 10. 2005 EIA no

149

Business centre
Českomoravská, Praha 9

17. 6. 2005

7. 10. 2005 EIA no

151

Underground station
Depo Hostivař – aboveground parts, 

29. 6. 2005

3. 10. 2005 EIA no

152

Headquaters TELECOM,
Praha 3 - Žižkov

1. 7. 2005

15. 9. 2005 EIA no

153

Development of the premises Holešovice of the company of
Pražská teplárenská, a. s., Praha 7

11. 7. 2005

23. 11. 2005 EIA no

154

Overall reconstruction and expansion of the CWWTP Prague
on the Emperor Island, Praha 6 a Praha 7

15. 7. 2005

31. 8. 2005 EIA yes

Consent given on
27. 10. 2005

155

Multipurpose building
Pankrác, ul. 5. května, Praha 4

22. 8. 2005

23. 11. 2005 EIA no

156

Warehouse hall
EFES, spol. s r. o., Praha - Řeporyje

31. 8. 2005

The EIA process cancelled upon the investor request on
5. 12. 2005; for new notification see 165

157

Modernisation of the Staropramen Brewery,
Praha 5

31. 8. 2005

2. 11. 2005 EIA no

158

Multipurpose building
Poutník, Praha 11, k.ú. Háje

12. 9. 2005

8. 12. 2005 EIA yes

Compiling documentation

159

Parking area for the sports and recreation
premises Petynka, Praha 6

15. 9. 2005

The EIA process cancelled
upon the investor request on
7. 2. 2006

160

Office centre
Pankrác, Praha 4

19. 10. 2005

22. 2. 2006 EIA no

161

EPOQUE Pankrác – HOTEL, Praha 4

27. 10. 2005

23. 2. 2006 EIA no

162

Tall warehouse – SO302
on the premises of ZENTIVA, a. s.,
k.ú. Dolní Měcholupy

10. 11. 2005

25. 1. 2006 EIA no

163

Business and residential centre Palmovka –
Dolní Libeň, Praha 8

28. 11. 2005

The EIA process cancelled
upon the investor request on
20. 3. 2006; for new notification see 191

164

Hangar G – ČSA,
Airport Praha - Ruzyně

30. 11. 2005

23. 2. 2006 EIA no

165

Warehouse hall
EFES, spol. s r. o., Praha - Řeporyje
(December 2005)

15. 12. 2005

25. 1. 2006 EIA no

166

Prague National Golf Club, Praha 16
(December 2005)

8. 12. 2005

27. 2. 2006 EIA no

167

Rozšíření areálu B64 Alliance UniChem CZ,
ul. Podle Trati, Praha 10, k.ú. Malešice

14. 12. 2005

6. 3. 2006 EIA yes

The EIA process cancelled
upon the investor request on
3. 4. 2006; for new notification see 186

168

Mining activities in the
mining area Zbraslav IV at reserved
deposit of sand-gravel at
Lahovice a Lahovice I, Praha 16

22. 12. 2005

5. 4. 2006 EIA yes

Compiling documentation

169

Underground garages on Square of
Jiřího z Poděbrad, Praha 3

29. 12. 2005

27. 3. 2006 EIA yes

Compiling documentation

170

Underground garages
Ondříčkova 37, Praha 3

29. 12. 2005

25. 5. 2006 EIA no

171

Recycling centre
for mineral demolition waste,
k.ú. Třeboradice (WECO)

2. 1. 2006

2. 3. 2006 EIA yes

Compiling documentation

172

Construction of a hall
for secondary raw materials processing –
sorting and pressing of recycled paper
on the premises of
Kovošrot, a. s. Praha - Dolní Měcholupy

5. 1. 2006

21. 2. 2006 EIA no

173

Business and office building,
ul. Opatovská, Praha 11 - Chodov
(December 2005)

9. 1. 2006

20. 3. 2006 EIA yes

The EIA process cancelled
upon the investor request on
27. 3. 2006

174

Lahovičky, k.ú. Lahovice, k.ú. Radotín,
Praha 16

6. 1. 2006

9. 3. 2006 EIA yes

Compiling documentation

175

Autocentrum „Emil Frey“, Praha 14 - Kyje

13. 1. 2006

3. 4. 2006 EIA no

176

Mobile concrete mixing plant Stetter M 1,5 – Praha 15, k.ú. Hostivař

18. 1. 2006

17. 3. 2006 EIA yes

Compiling documentation

177

Warehouse and shopping premises with
office representation for the Czech Republic –
Richter + Frenzel, Praha 14 - Kyje

27. 1. 2006

7. 4. 2006 EIA no

178

Forest-park Vinice, Praha -
Dolní Počernice a Praha - Běchovice

2. 2. 2006

22. 3. 2006 EIA no

179

Food store and office building
with a restaurant, Praha 5, k.ú. Zbraslav,
ul. Elišky Přemyslovny

6. 2. 2006

10. 4. 2006 EIA no

180

Prague’s Fair Premises

25. 11. 2005

19. 5. 2006 EIA yes

Compiling documentation

181

Residential houses
Dolní Počernice - South
při ul. Českobrodská a U Konečné, Praha 14

15. 3. 2006

10. 7. 2006 EIA no

182

KOLBEN BUSINESS PARK,
Kolbenova ulice Praha 9 - Vysočany
(March 2006)

22. 3. 2006

Preliminary procedure
ongoing

183

Printing house Poděbradská 26 –
IV. phase, Praha 9, k.ú. Vysočany

29. 3. 2006

21. 6. 2006 EIA no

184

Business and multipurpose buildings on land plots 4137/73
and 4137/311, c.d. Modřany and c.d. Kamýk

1. 3. 2006

26. 7. 2006 EIA no

185

Plan for opening, preparatiosn, and mining
on te mining area Zadní Kopanina I, quarry
Hvížďalka, mine filed Centre, Southwest
and Northwest (POPD till 2045)

31. 3. 2006

24. 7. 2006 EIA no

186

Expansion of premises of
Alliance UniChem CZ, ul. Podle Trati,
Praha 10, k.ú. Malešice (March 2006)

5. 4. 2006

13. 7. 2006 EIA no

187

New construction of a ware-
house for hazardous waste on the premises
of the company of Mahrla, spol. s r. o. –
hala č. 5, k.ú. Dolní Měcholupy

12. 4. 2006

not issued

The EIA process cancelled
upon the investor request on
9. 6. 2006

188

Extension of the sewerage collector H,
Praha - Dolní Počernice a Praha - Běchovice

12. 4. 2006

not issued

The EIA process cancelled
upon the investor request on
21. 8. 2006

189

Recycling plant for mineral
demolition waste, k.ú. Ruzyně

14. 4. 2006

Preliminary procedure
ongoing

190

Golf premises
GOLF RESORT BLACK BRIDGE
Praha 9 - Dolní Počernice

26. 4. 2006

Preliminary procedure
ongoing

191

Business and residential centre Palmovka – Dolní Libeň,
Praha 8 (April 2006)

28. 4. 2006

7. 7. 2006 EIA no

Original notification see 163

192

Svoboda Press, a. s., Printing
machines LITHOMAN III, LITHOMAN IV
a WEB 8 – HEIDELBERG, Praha 10

3. 5. 2006

30. 6. 2006 EIA no

193

BB Centrum – building G,
MČ Praha 4 - Michle

16. 5. 2006

13. 7. 2006 EIA no

194

Office centre
Invalidovna, Praha 8 - Karlín

29. 5. 2006

10. 8. 2006 EIA no

195

Multipurpose centre
Klíčov, Praha 9 - Vysočany

29. 5. 2006

28. 8. 2006 EIA no

196

Additional construction of a part of the
production hall of the company of
TECOM paper, Toužimská 948/24 b,
Praha 19 - Kbely

9. 6. 2006

30. 6. 2006 EIA no

197

AUTOSALON SUMMIT MOTORS,
Praha 13, k.ú. Stodůlky

2. 6. 2006

198

Distribution warehouse
BMW Hašek – premises of
hypermarket Globus, Praha - Čakovice

13. 6. 2006

14. 7. 2002 EIA no

199

Building modifications
ČS PHM, Praha - Horní Počernice –
service expansion

19. 5. 2006

18. 7. 2006 EIA no

200

Golf training course
Vinoř, Praha - Vinoř

23. 6. 2006

9. 8. 2006 EIA no

201

Addititonal construction
Depandance Rača/Crowne Plaza on the premises of the Hotel
B69Crowne Plaza, Praha 6

26. 6. 2006

Preliminary procedure
ongoing

202

Parking area and related facilities serving
the parking and for small retail at the streets
Zenklova a Na Dědince, Praha 8, k.ú. Libeň

27. 6. 2006

25. 7. 2006 EIA no

203

MAIN POINT KARLIN, in between streets Rohanské nábřeží
and Pobřežní, Praha 8 - Karlín

29. 6. 2006

10. 8. 2006 EIA no

204

Facility for the biogas
production from biowaste on the waste
incineration plant premises,
Praha 10, k.ú. Malešice

30. 6. 2006

Preliminary procedure
ongoing

205

BB Centrum – building Delta 1,
Praha 4 - Michle

29. 6. 2006

Preliminary procedure
ongoing

206

New sports hall and additional
construction and of the existing building
of the restaurant and waredrobes
Sportovního areálu Braník, Praha 4

30. 6. 2006

Preliminary procedure
ongoing

207

Residential premises
„U Botiče“, Praha 10 - Záběhlice

11. 7. 2006

Preliminary procedure
ongoing

208

Libeňská connection, construction No. 8313, Praha 8

24. 7. 2006

Preliminary procedure
ongoing

209

Asphalt mixing plant, Praha 15 - Dolní Měcholupy

27. 7. 2006

Preliminary procedure
ongoing

210

Tyre service Procházka,
Netřebská ul., č. parc. 987/1, 987/2 (část)
k.ú. Ruzyně, Praha 6

28. 7. 2006

Preliminary procedure
ongoing

211

Construction modifications to the tenement villa
Nad Santoškou 1420/8, Praha 5 - Smíchov

31. 7. 2006

30. 8. 2006 EIA no

212

Container port
Praha - Malešice

31. 7. 2006

Preliminary procedure
ongoing

213

Completion of sports premises STEP,
Praha 9, k.ú. Libeň

7. 8. 2006

Preliminary procedure
ongoing

214

Residential premises
Homolka III, ul. Jeřabinová, Praha 5

7. 8. 2006

Preliminary procedure
ongoing

215

Villas above Rokytka Stream, Praha 9, k.ú. Vysočany

7. 8. 2006

Preliminary procedure
ongoing

216

Warehouse halls C and D, Areál NÁBYTEK SERVIS, a. s.,
Kutnohorská 359/80, Praha 10

7. 8. 2006

Preliminary procedure
ongoing

217

Residential premises
Jáchymovská, Praha - Řeporyje

10. 8. 2006

Preliminary procedure
ongoing

218

Residential premises
Modřanská rokle v Praze 12 – k.ú. Modřany

15. 8. 2006

Preliminary procedure
ongoing

219

Residential houses –
Zámecký dvůr Vinoř, Praha - Vinoř

22. 8. 2006

Preliminary procedure
ongoing

220

Sports and recreation premises,
Tomanova  ul., Praha 6, k.ú. Břevnov

18. 8. 2006

Preliminary procedure
ongoing

221

Sale, service, and warehouse PNEU „Procházka“, Černokostelecká 218/84, k.ú. Strašnice,
Praha 10

23. 8. 2006

Preliminary procedure
ongoing

222

Facility for the purchase, concentration,
and storage of waste and secondary raw
materials, Praha 22, k.ú. Uhříněves

24. 8. 2006

Preliminary procedure
ongoing

223

PEMA - Dolní Chabry – parking area, Praha 8, k.ú. Dolní Chabry,
Čimice

25. 8. 2006

Preliminary procedure
ongoing

224

Construction modifications of garages for car parking,
Biskupcova 21/18, Praha 3 - Žižkov

16. 8. 2006

Preliminary procedure
ongoing

Source: OOP MHMP

Tab. Overview of EIA activities – classified according to the type activity assessed, OOP MHMP is the competent authority, notifications submitted from 1. 9. 2005 to 31. 8. 2006

Restructuring of lands in landscape, use of unmanaged lands for intensive agriculture, setting agricultural land aside on the area from 10 hectares (pursuant to point 1.2 category II of the Annex No. 1 of the Act)

1

1,5 %

Waste water treatment plants and sewerage systems from 5,000 to 50,000 p.e. or industrial sewerage system with diameter larger than 500 mm (pursuant to point 1.9 category II of the Annex No. 1 to the Act)

1

1,5 %

Mining of minerals, exploitation of peat (pursuant to point 2.5 category II of the Annex No. 1 to the Act)

3

4,5 %

Production and repairs of motor vehicles, railway carriages, tankers, boats, and aeroplanes (pursuant to point 4.3 category II of the Annex No. 1 of the Act)

1

1,5 %

Printing facilities (pursuant to point 5.6 category II of the Annex No. 1 to the Act)

2

3,0 %

Production of building materials and products (pursuant to point 6.2 category II of the Annex No. 1 to the Act)

1

1,5 %

Asphalt mixing plants (pursuant to point 6.5 category II of the Annex No. 1 of the Act)

1

1,5 %


New constructions and reconstructions of roads or local communications (pursuant to point 9.1 category II of the Annex No. 1 to the Act)

1

1,5 %

Railways (pursuant to point 9.2 category II of the Annex No. 1 to the Act)

1

1,5 %

Facilities for storage, treatment, or reuse of selected hazardous wastes; facilities for physical-chemical treatment, energy use, or disposal of other wastes (pursuant to point 10.1 category II of the Annex No. 1 to the Act)

6

9,0 %

Warehouse or commercial premises, incl. shopping malls, parkings, or garages(pursuant to point 10.6 category II of the Annex No. 1 to the Act)

31

46,3 %

Sports premises, golf courses, motocross, cyclocross, and cyclotrial premises (pursuant to point 10.8 category II of the Annex No. 1 to the Act)

4

6,0 %

(Recreational premises, hotel premises and related facilities (pursuant to point 10.11 category II of the Annex No. 1 of the Act)

1

1,5 %

Thematic premises on the area over 5,000 sq m (pursuant to point 10.13 category II of the Annex No. 1 of the Act)

2

3,0 %

Plans pursuant to the Annex No. 1, which do not reach the appropriate limit values, if these limit values are given in the Annex; constructions, activities, and technologies not stated under the Annex points, which may significantly affect areas of territories of European importance or bird areas (pursuant to point 10.15 category II of the Annex No. 1 of the Act)

11

16,4 %

Total

67

100,0 %

Source: OOP MHMP

Tab. Overview of EIA activities – classified according to administrative districts, OOP MHMP is the competent authority, notifications submitted from 1. 9. 2005 to 31. 8. 2006

Praha 1

0  activity

Praha 2

0  activity

Praha 3

3  activities

Praha 4

5  activities

Praha 5

3  activities

Praha 6

6 activities

Praha 7

0  activity

Praha 8

7  activities

Praha 9

6 activities

Praha 10

7  activities

Praha 11

2 activities

Praha 12

2  activities

Praha 13

3  activities

Praha 14

2 activities

Praha 15

6  activities

Praha 16

3 activities

Praha 17

0 activity

Praha 18

0 activity

Praha 19

4 activities

Praha 20

1 activity

Praha 21

0 activity

Praha 22

1 activity

Activities affecting more administrative districts

6 activities

Total

67 activities

Source: OOP MHMP

Tab. Overview of EIA activities pursuant to the Act No. 100/2001 Code, the MOE CR as competent authority, state from 1. 9. 2005 to 31. 8. 2006

Name of activity Date of the EIA
notification
Conclusion of
the preliminary procedure
Phase of the EIA project

Production hall and pre-insulated pipeline of Fin Therm, Praha 9 - Třeboradice

22. 12. 2003

10. 6. 2004 EIA
yes

Consent on 31. 10. 2005

Crematorium for animals bred for joy

24. 3. 2004

31. 5. 2004 EIA
yes

Compiling documentation

cable 110 kV
Karlov - Pankrác, Praha 4 a 2

9. 8. 2004

19. 10. 2004 EIA
yes

Consent on 7. 4. 2006

Modernising of the railway Prague–Kladno with a connection to the Airport Ruzyně (project PraKú), II. phase

12. 1. 2005

18. 3. 2005 EIA
yes

Compiling documentation

grid line 2 x 110 kV
Chodov - Uhříněves - Měcholupy

15. 2. 2005

29. 4. 2005 EIA
yes

Ordered assessment of the
completed documentation

line relocation of 2 x 110 kV,
cadastral districts Letňany, Ďáblice, Střížkov

31. 3. 2005

20. 6. 2005 EIA
yes

Consent on 25. 5. 2006

Facility for collection, purchase, and reuse of metal waste and car wrecks,
plant Ke Kablu 378, Praha 10

27. 4. 2005

17. 8. 2005 EIA
yes

Consent on 22. 12. 2005

Parallel RWY 06R/24L,
Airport Praha - Ruzyně

22. 8. 2005

2. 12. 2005 EIA
yes

Compiling documentation

City Ring Road, construction No. 0081 Pelc Tyrolka - Balabenka

9. 9. 2005

9. 12. 2005 EIA
yes

Compiling documentation

City Ring Road, construction
No. 0094, section Balabenka–Šterboholská Radial Road

9. 9. 2005

30. 11. 2005 EIA
yes

Compiling documentation

Praha–Beroun – New railway connection

8. 11. 2005

30. 12. 2005 EIA
yes

Compiling documentation

Břevnov Radial Road No. 7553

12. 1. 2006

16. 3. 2006 EIA
yes

Compiling documentation

Source: OOP MHMP

Tab. Overview of EIA activities pursuant to the Act No. 244/1992 Code in wording of the Act No. 132/2000 Code, state from 1. 9. 2005 to 31. 8. 2006

Competent Authority EIA activity Date of
notification
Date of public hearing, phase
of the EIA process
Issuing of
Statement

Ministry of the Environment
of the Czech Republic

The Prague Ring Road,
construction 520,
Březiněves, Satalice

28. 2. 2001

Adding information
to the documentation

Ministry of the Environment
of the Czech Republic

Fast-train railway Prague–
Ruzyně Airport–Kladno, I. phase

21. 12. 2001

Public hearing on 25. 4. 2003,
documentation returned
for adding further alternatives
of the route

Source: OOP MHMP

20. června 2007
20. června 2007